2026 Tariffs Triple Siding Costs: Top Alternatives
Homeowners planning exterior upgrades face a sharp increase in material costs due to new tariffs on imported fiber cement siding. These tariffs have elevated prices beyond typical budgets, prompting many to delay projects or select different materials. This guide explains the implications of these changes, offers planning strategies, and evaluates cladding options based on cost, performance, and building code requirements.
Cost and Planning Guide
Scope of Work
A complete siding project involves removing old cladding, preparing walls, installing moisture barriers, adding trim and flashing, and applying new panels or boards. Coverage typically ranges from 1,800 to 2,800 square feet for most homes. Labor accounts for at least half the total expense, particularly on elevated surfaces or around intricate window details.
Total Range and Per Square Foot Figures
Tariffs have raised fiber cement installation costs to between $13 and $19 per square foot. Engineered wood falls in the $9 to $13 range, vinyl between $6 and $10, and steel or aluminum panels from $11 to $16. These figures cover removal and disposal of existing materials, house wrap application, and finish trim.
Variations in local labor rates, site accessibility, and building height can adjust totals by up to 20 percent. Projects with extensive trim, curved surfaces, or connected decks often reach the higher end of these estimates.
Cost Drivers
- Material supply and freight. Imported fiber cement boards now incur tariff penalties and elevated shipping expenses.
- Labor skill level. Cutting fiber cement demands specialized blades and respiratory protection, extending work time and safety measures.
- Waste factor. Brittle materials generate about 10 percent waste from breakage and cuts.
- Trim and flashing complexity. Additional corner boards, window casings, or custom caulking add distinct charges.
- Removal and disposal. Handling old asbestos or lead-containing siding requires certified professionals and extra fees.
Timeline from Bid to Punch List
- 1 week: Conduct site visits and obtain written estimates.
- 2 to 4 weeks: Order materials and secure permits.
- 1 to 3 weeks: Perform installation and complete finishes.
- Final day: Conduct walkthrough, address touch-ups, and handle cleanup.
Delays from weather or inspections may extend the schedule. Contracts should specify provisions for weather-related interruptions.
Permits, Inspections, Access
Full siding replacements generally require municipal permits. Inspectors verify wall sheathing, moisture barriers, and flashing prior to panel installation. Ensure clear access to driveways or yards for trailers and material deliveries, while safeguarding landscaping and locating underground utilities in advance.
Budget Controls and Change Order Traps
Reserve at least 10 percent of the budget for contingencies. Frequent add-ons include rot repairs, sheathing replacements, or insulation enhancements. Insist on written documentation for any change orders to prevent unexpected bills.
Repair vs Replace
Spot repairs work for isolated cracks in fiber cement. However, if more than 20 percent of the surface shows swelling, delamination, or paint deterioration, a full replacement proves more economical. Modern alternatives enhance visual appeal and energy efficiency.
Durability and Safety Brief
Weather Risks
Fiber cement withstands fire and pests effectively, though unsealed boards may absorb moisture during freeze-thaw cycles, reducing longevity. Engineered wood requires adequate spacing from ground level and roof edges. Vinyl thrives in humid areas but risks warping in intense heat. Metal options excel in coastal or windy locations when secured with proper gaskets.
Fire, Moisture, and Impact Performance
| Material | Fire Resistance | Moisture Resistance | Impact Rating |
|---|---|---|---|
| Fiber Cement | Excellent | Good | Moderate |
| Engineered Wood | Fair | Moderate | Good |
| Vinyl | Poor | Excellent | Low |
| Metal | Excellent | Excellent | High |
Envelope Details That Prevent Failures
- Apply continuous house wrap over all siding substrates.
- Seal windows, doors, and horizontal joints with self-adhering membranes.
- Incorporate starter strips and vented rainscreens for drainage.
- Ensure 6 inches of clearance from soil and 2 inches from roofing materials.
Care Schedule and Safe Cleaning Methods
- Annually: Examine caulk joints and repaint any chips.
- Every 3 to 5 years: Clean with mild soap and a soft brush. Limit pressure washing to under 1,200 psi.
- After storms: Inspect fasteners and trim for shifts. Replace affected areas without delay.
Warranty Basics and Owner Responsibilities
Warranties typically address manufacturing flaws but exclude installation or upkeep issues. Retain all documentation and capture timestamped installation photos. Using improper tools or neglecting joint seals may invalidate protection.
Step-by-Step Project Prep
1. Define Goals and Scope
Clarify priorities such as budget constraints, aesthetic upgrades, or long-term durability. With tariffs positioning fiber cement as a luxury choice, evaluate lifetime expenses over initial quotes.
2. Shortlist Contractors and Compare Bids
Contact at least three licensed professionals experienced in your chosen material. Confirm their insurance, client references, and waste management approach. Require bids to encompass flashing, trim, and painting for fair comparisons.
3. Samples, Mockups, Approvals
Request full-scale samples rather than small swatches. Attach a test panel to an inconspicuous area to assess color and texture in natural light. Document adjustments prior to placing the final order.
4. Site Readiness and Daily Routine
Remove obstacles like furniture, plants, and vehicles from the work zone. Anticipate noise and dust throughout the day. Crews often begin at dawn and wrap up by dusk; confine pets indoors and lock gates.
5. Quality Checks at Each Milestone
- Pre-installation: Verify material deliveries match specifications and inspect for damage.
- During framing: Confirm proper flashing and barrier alignment.
- Post-installation: Check panel leveling, joint sealing, and trim fit.
- Final walkthrough: Test for secure attachments and even paint coverage.
Maintaining Your Siding Investment
New siding boosts home value and comfort when paired with routine maintenance. Select materials that align with your climate and lifestyle for lasting protection. By planning ahead and choosing wisely, you secure a durable exterior that withstands time and elements while staying within budget.