Labor Shortage Doubles Fiber Cement Siding Waits

October 9, 2025
6 min read
Featured image for Labor Shortage Doubles Fiber Cement Siding Waits
SidingHelp - Siding Replacement, Material Comparisons & Cost Guides

Labor Shortage Extends Fiber Cement Siding Timelines

Homeowners planning fiber cement siding installations now confront extended wait periods, increased bids, and constrained contractor availability. Shortages in skilled exterior trade workers have intensified, causing even substantial projects to experience delays of several months before crews become available. This guide details the impacts on project timelines, expenses, and quality standards, along with practical measures for homeowners to advance their initiatives successfully.

Cost and Planning Essentials

Defining the Project Scope

A comprehensive siding replacement encompasses the removal of existing cladding, repairs to underlying sheathing, application of weather-resistant barriers, installation of flashings, placement of fiber cement panels or planks, and addition of trim elements. Numerous crews also manage soffits and fascias, which extend the required labor duration. While smaller repair tasks prove simpler to arrange, they encounter comparable limitations in materials and workforce availability.

Pricing Overview and Per-Square-Foot Estimates

Current averages for a full fiber cement siding installation range from 12 to 18 dollars per square foot. Materials constitute approximately one-third of the overall expense, with labor and associated overhead comprising the balance. Projects on single-story homes with basic trim fall toward the lower spectrum, whereas two-story structures or those featuring custom elements, multiple angles, and gables elevate costs.

Factors Influencing Expenses

  1. Labor availability: Reduced numbers of certified installers result in elevated hourly wages.
  2. Removal challenges: Structures with accumulated siding layers or lead-based paint demand specialized procedures.
  3. Intricate detailing: Elements such as corners, window surrounds, and soffit transitions require additional time for precise cutting and sealing.
  4. Site accessibility: Confined yards or sloped terrain complicate material delivery and on-site preparation.
  5. Environmental conditions: Precipitation or intense heat interruptions prolong crew engagements.

Timeline Breakdown from Contract to Completion

Projects typically span 10 to 14 weeks from contract signing to final walkthrough. The phases unfold as follows:

Stage Average Duration Key Considerations
Bidding and proposal 1 to 2 weeks Limited contractor options slow responses
Material procurement 2 to 4 weeks Manufacturing backlogs and shipping issues prevail
Pre-installation setup 1 week Encompasses permitting and site organization
Core installation 3 to 5 weeks Progress depends on crew capacity
Final inspection 1 week Covers sealing, painting, and site restoration

Navigating Permits, Inspections, and Site Preparation

Most local authorities mandate permits for siding work. Inspectors verify the integrity of weather barriers, flashing installations, and secure fastening methods prior to sign-off. Scarce inspection slots may prolong timelines, so schedule appointments promptly. Ensure driveways remain unobstructed for deliveries and designate a dedicated staging zone adjacent to the building.

Budget Management and Avoiding Change Orders

Request itemized unit costs for demolition, sheathing fixes, and trim enhancements, as these often prompt adjustments to the original scope. To maintain financial control:

  • Establish a contingency fund limited to a predetermined percentage of the total budget.
  • Document approvals for any material substitutions.
  • Monitor billed labor hours closely when projects operate on a time-and-materials basis.

Deciding Between Repairs and Full Replacement

Spot repairs suit scenarios where damage affects fewer than 15 percent of panels. However, inconsistencies in finish tones and unavailable matching profiles often favor complete section replacements. In periods of labor scarcity, fragmented tasks may face even greater postponements, as contractors prioritize larger undertakings.

Durability and Safety Considerations

Mitigating Weather-Related Vulnerabilities

Fiber cement siding outperforms vinyl and wood in resisting temperature extremes and high winds, yet flawed installation practices can compromise longevity. Omissions in flashing or inadequate joint sealing permit moisture infiltration behind the panels. In areas with high humidity, routine caulking and painting upkeep avert issues like swelling or separation.

Performance Against Fire, Moisture, and Physical Stress

This material resists combustion and undergoes rigorous fire-testing protocols. It avoids decay and pest infestation, though unsupported sections risk cracking from severe impacts. Enhanced fastening techniques and joint reinforcements bolster overall resilience.

Critical Installation Practices to Ensure Longevity

  1. Apply flashing to all horizontal seams.
  2. Position panels with a 1-inch gap above decks and roofing surfaces.
  3. Elevate siding at least 6 inches from ground level to deter moisture rise.
  4. Select fasteners resistant to corrosion as per manufacturer guidelines.
  5. Prime and paint all on-site cuts prior to mounting.

Maintenance Routine and Cleaning Protocols

Perform annual cleaning with a soft-bristled brush and gentle detergent solution. Steer clear of pressure washing, which may force water into concealed areas. Refresh the paint finish every 10 to 15 years or upon noticeable fading. Inspect caulk lines around corners and seams each spring, replacing any deteriorated material promptly.

Understanding Warranties and Owner Obligations

Material warranties from producers generally span 30 to 50 years, though labor protections seldom exceed 10 years. Coverage remains intact only with proper upkeep of paint and sealants. Harsh cleaning methods or non-compliant fasteners may invalidate claims. Retain documentation of purchases and inspections for reference.

Strategies for Handling Delays and Aligning Expectations

Persistent labor shortages book reliable contractors months in advance. Homeowners mitigate irritation through proactive communication and realistic planning. Effective approaches include:

  1. Secure contracts early to reserve crew slots ahead of material purchases.
  2. Accommodate slight adjustments in scheduling without disruption.
  3. Refrain from alterations during execution, as each modification resets timelines.
  4. Verify shipment schedules and obtain tracking for bulk panel deliveries.
  5. Consider a hold deposit to encourage priority treatment from trusted providers.

Should unavoidable postponements occur, document all interactions in writing. Organized and understanding clients often receive better service from contractors.

Frequently Asked Questions

Why have fiber cement installation crews become scarcer?
Experienced workers have retired or transitioned to alternative sectors. Onboarding novices demands extended training due to the material's unique cutting requirements and safety protocols.

How can homeowners expedite their siding projects amid shortages?
Engage multiple contractors for bids early and explore off-peak scheduling. Bundling siding with other exterior tasks may consolidate crew time.

What signs indicate a need for full siding replacement over repairs?
Widespread damage exceeding 15 percent, mismatched aesthetics from patchwork, or underlying moisture issues signal the benefits of a complete overhaul.

Sustaining Your Siding Investment

Fiber cement siding delivers enduring protection and aesthetic appeal when installed and maintained correctly. By anticipating labor challenges, budgeting wisely, and adhering to care guidelines, homeowners secure a resilient exterior that enhances property value. Proactive steps today ensure your home withstands environmental demands for decades, minimizing future interventions and costs.