The best way to Raise a Concrete Shower Stage

Shower pans or shower stages consists of a shower floor foundation covered with tiles that are ornamental. Improperly shower foundations that are concrete possess the incline that is incorrect or have curbs place low in the ground. Indications of a shower flooring using a slope that requires lifting is water flooding your bathroom and pooling up on the area. To be able to lift a shower pan, concrete stage and the first tiled shower flooring has to be taken off.

Choose the necessary building permits and test with local building codes to make sure that you accurately install the concrete shower stage that is elevated.

Make use of a sledgehammer to tap on the tile on the ground of the shower only enough to fracture it and allow it to be break. Pry up the damaged tile and put it around the plastic sheeting for elimination. Take away curb tile as well as the tile found 6 inches up the shower partitions from the ground in the exact same way.

Break up the floor of the shower in to 1-foot parts. Take away together with the prybar. In the event the wire net, called a steel lathe, found beneath the concrete will not appear with it, reduce on it with tin snips and take it off. Make use of a flat-blade screw-driver to eliminate any staples or nails that have been used to fasten the wire net to the ground. Take away on the shower walls and control in exactly the same way. Pry upward and take away the shower curb.

Replace the wood sub-floor if it’s rotting or has obvious water water damage and mold, like black spot or places that are decaying. Cut out the damaged part of the subfloor using a jigsaw — you also might hit a bong or take care to not cut also deep. Cut a part of 3/4 inch-thick plywood to to suit the eliminated region of subfloor. Make use of a nail gun inch ring shank nails to nail the plywood to the wood board underlayment.

Distribute a layer of mortar in the located area of the shower curb, that’s 1-inch thick and 8-inches broad, on the sub-floor. Set the initial cement block and align it together with the shower door-opening. Use an even layer of mortar on the face of the brick that is adjoining after which put down the block. Continue incorporating bricks before the kerb is the height that is desirable. The shower curb bricks must be the very least of 2″ taller compared to closing height of the shower drain.

Take away. Take away on the top drain flange, then pry up the top and lower drain flange from the drain foundation with all the flat-blade screw-driver. Cover the drain opening with masking tape from getting to the pipes to stop mortar.

Put on the mortar to the shower ground. Make use of the shower incline tool to produce a 1/4 inch pitch on the incline angle pointing with all sides of the drain, Allow the mortar remain for 2 4 hrs to let it place.

Place the shower lining on the ground using the sides of the lining running 6″ up the wall from a floor. Work with a hole to reduce from the lining for the drain. Fold the lining within the shower curb.

Bend steel lathe and minimize on it where the shower lining continues to be set therefore that it suits within the shower curb and 6″ upward onto the wall. Place on the shower ground and cut a hole for the shower drain with tin snips.

Reinstall the lower and drain flange. Use a slender bead of caulking before reinstalling the drain flange to the reduced drain flange if needed by neighborhood creating code. Reinstall the shower drain protect. Use masking tape to cover the shower drain cover to safeguard it

Apply the Thinset mortar to the shower floor, and the metal lathe on the wall. Make the flooring thin-established mortar as thick as desirable to lift the shower stage that is concrete. Make use of the shower floor incline tool to make sure that you maintain the 1/4 inch incline on the flooring to permit appropriate drainage. Before installing the shower flooring and wall tile on the shower curb wait 24 hrs.